Restoration of Left Hand Creek Reach 3B- Boulder County, CO - The Watershed Center ITB-JO-LWOG- 2016-01
The Watershed Center » ITB-JO-LWOG- 2016-01
The Watershed Center » ITB-JO-LWOG- 2016-01
The information below is a summary of solicitation number ITB-JO-LWOG- 2016-01 posted by Lefthand Watershed Oversight Group. As a reminder, this solicitation is closed and responses are no longer being accepted.
Restoration of Left Hand Creek Reach 3B- Boulder County, CO
Date Issued: 03/07/2016
Deadline: 04/01/2016 prior to 4:30 PM M.D.T.
Requisition Number: LWOG-2016-01
Delivery Point: Niwot, CO
Delivery Date: At contract execut.
Type of Purchase: Term: 18 month period starting from March 2016
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: Lefthand Watershed Oversight Group
Using Department: LWOG
Special Notices:
Bid Bond Required
Bid Deposit Required
Certified Payroll
Contractors License Required
Federally Funded
Installation Required
Insurance Required
Labor and Materials Bond Required
License Required
Material Safety Data Sheets Required
Payment Bond Required
Performance Bond Required
Performance Bond/Guarantee Required
Prevailing Wage Required
Safety Standards/Plan
Job-Walk Visit Mandatory on 03/21/2016 02:30 PM at 8270 North 87th street, Longmont CO
ACCEPTING VENDOR QUESTIONS:
Due Date: 3/25/2016 3:00:00 PM M.D.T.
Primary Contact Name: Ms. Jessie Olson
Title: Watershed Coordinator
Email: joslon@lwog.org
SUMMARY OF SPECIFICATIONS:
Please see www.lwog.org for full bid package. The specific elements of this proposed project are to restore this 2,200 foot section of the creek from Diagonal Highway (CO 119) upstream to 87st Street (Airport Road) in order to restore geomorphic function, improve flood resiliency, facilitate restoration of recreational access, and reduce flood risks as outlined in the 2014 Left Hand Creek Watershed Master Plan. The project will include the following elements: rebuild floodplain benches/stabilize banks; narrow the channel, add riffle/pool complexity, and reestablish riparian vegetation; clean excessive sediment at road crossings in particular, and along the entire creek section as required; establish a compound channel, including a low flow channel which will promote appropriate sediment transport and a floodplain to provide conveyance of water and debris during floods; remove sediment and debris from 87th Street bridge crossing, which will enlarge and stabilize the channel and facilitate maintenance of the existing bike path underpass; and perform passive restoration and re-vegetation. The main goal of the project is to improve the geomorphic and ecologic function of the site and reduce flood risk.
SIMILAR BIDS FROM THE WATERSHED CENTER
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Regional Stream Recovery & Stewardship Handbook | RFP-YS-LWOG-2016-02 | 9/9/2016 4:30:00 PM |
30 Percent Designs of James Creek | RFP-JO-LWOG-2015-01 | 10/21/2015 4:30:00 PM |