Orchard Avenue Sidewalk Improvements - Colorado Mesa University ITB-CMU 2547

Colorado Mesa University » ITB-CMU 2547

The information below is a summary of solicitation number ITB-CMU 2547 posted by Colorado Mesa University.  As a reminder, this solicitation is closed and responses are no longer being accepted.

Orchard Avenue Sidewalk Improvements

Date Issued: 05/17/2016

Deadline: 05/27/2016  prior to 11:00 AM   M.D.T.

Requisition Number:

Delivery Point: Grand Junction, CO

Delivery Date: 08/01/2016

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Colorado Mesa University

Using Department: Facilities Department

Special Notices: Bid Bond Required
Insurance Required
Labor and Materials Bond Required
Performance Bond Required
Prebid Conference Mandatory on 05/20/2016 09:00 AM at Colorado Mesa University Campus Services Administration #111, 1260 Kennedy Avenue Grand Junction, CO

ACCEPTING VENDOR QUESTIONS:

Due Date: 5/23/2016 2:00:00 PM M.D.T.

Primary Contact Name: Ms. Suzanne Ellinwood

Title: Purchasing Manager

Email: sellinwo@coloradomesa.edu

SUMMARY OF SPECIFICATIONS:

Colorado Mesa University (CMU) is seeking proposals from qualified contractors interested in providing construction services for the removal and replacement of existing concrete sidewalk and landscape along the south edge of Orchard Avenue, from 12th Street to the east side of the Elliot Tennis Center.  The project proposes the following improvements; 1. Remove concrete curb, gutter and sidewalk along the south side of Orchard Avenue from 12th Street, west to the east edge of the Elliot Tennis Center 2. Relocate street signs and existing irrigation systems along Orchard Ave. 3. Extend new lateral line and wires to existing zones along 12th Street. 4. Install 688 sy of 4” thick concrete sidewalk 5. Install 522 sy of 4” thick colored concrete sidewalk 6. Install 23 sy of 4” thick colored, patterned concrete sidewalk 7. Install new sod and landscape beds 8. Install 97 sy of 8” thick patterned concrete sidewalk 9. Install 34 sy of 8” thick colored, patterned concrete sidewalk 10. Install new irrigation system for all landscape anticipated in the scope of work. All work anticipated in the construction drawings and Bid Schedule shall be accomplished in accordance with the attached project specifications and the 2010 version of the City of Grand Junction’s Standard Contract Documents for Capital Improvements Construction.  

SIMILAR BIDS FROM COLORADO MESA UNIVERSITY

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
Small Business General Contractor Prequalification RFQ-CMU 2539  5/25/2016 11:00:00 AM 
CMU 2527 Engineering Building RFP RFP-CMU 2527  2/24/2016 11:00:00 AM 
Student Housing Phase VII RFP- CMU 2516  8/10/2015 11:00:00 AM 
Colorado Mesa University Sidewalk Improvements project ITB-CMU 2495  4/14/2015 11:00:00 AM 
Pinon Living Learning Center CMGC RFP-CMU 2494  3/27/2015 11:00:00 AM 
Small General Contractor Prequalification RFQ-02-13-2015  2/17/2015 11:00:00 AM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location