2014 Asphalt Paving Project

Date Issued: 04/09/2014

Deadline: 05/07/2014  prior to 2:00 PM   M.D.T.

Requisition Number:

Delivery Point: Cherry Hills Village, CO

Delivery Date: 2014

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: City of Cherry Hills Village

Using Department: Public Works

Special Notices: All or None Award
Bid Bond Required
Insurance Required
Performance Bond Required

ACCEPTING VENDOR QUESTIONS:

Due Date: 5/6/2014 4:00:00 PM M.D.T.

Primary Contact Name: Mr. Ralph Mason

Title: Right-of-Way Projects Manager

Email: rmason@cherryhillsvillage.com

SUMMARY OF SPECIFICATIONS:

The Project consists of constructing approximately 654 tons of a 2-inch asphalt overlay, with approximately 5,777 square yards of milling (2-inch depth), and approximately 3,888 square yards of Petro Mat installation, at four separate locations. The Project will also include the New Construction of a 5-inch asphalt apron on a gravel road (compacted to 4-inches) with approximately 123 tons of placement. Total asphalt placement for the five locations is estimated at 777 tons. The City will provide the dirt work preparation for the apron installation. The Contractor will need to provide all Traffic Control throughout the Project that will include a single lane closure (slow lane) on State Highway 285 eastbound at Parkway Drive. It will be the Contractors responsibility to secure a State Highway Right of Way Permit, provide a Traffic Control Supervisor (TCS), State Certified Flaggers, all traffic control devices, and work within all the guidelines of the State Permit. All Streets in this Project are located in the City of Cherry Hills Village. 

SIMILAR BIDS FROM CITY OF CHERRY HILLS VILLAGE

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
2016 Chipseal Project RFB-2016 Chipseal Project  3/1/2016 3:00:00 PM 
2016 Asphalt RFB- 2016 Asphalt  3/1/2016 2:00:00 PM 
2015 Chipseal Project RFB-2015 Chipseal  2/25/2015 2:00:00 PM 
2014 Concrete Replacement RFB-2014 Concrete Project  5/7/2014 2:00:00 PM 
2013 Asphalt Overlay and Milling Project RFB-Asphalt Overlay and Milling Project  3/18/2013 10:00:00 AM 
2013 Chipseal Project RFB-2013 Chipseal Project  3/18/2013 10:00:00 AM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location