Pavement Condition Assessment - City of Brighton RFP-15-027
City of Brighton » RFP-15-027
City of Brighton » RFP-15-027
The information below is a summary of solicitation number RFP-15-027 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
Pavement Condition Assessment
Date Issued: 04/30/2015
Deadline: 05/29/2015 prior to 10:00 AM M.D.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: TBD
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Street/Fleet
Special Notices:
All or None Award
FOB Destination
Insurance Required
Payment Terms = Net 30
Prebid Conference Recommended on 05/14/2015 10:00 AM at City Hall, 500 S. 4th Avenue, Brighton, CO 80601
ACCEPTING VENDOR QUESTIONS:
Due Date: 5/20/2015 4:00:00 PM M.D.T.
Primary Contact Name: Mrs. Pamela L. Roeding, CPM
Title: Procurement 7 Contracts Supervisor
Email: proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City of Brighton, Colorado by and through its Procurement and Contracts Supervisor is soliciting written sealed proposals from qualified firms to perform services for a Pavement Condition Assessment. The City of Brighton is creating a pavement management program. A MicroPAVER database with 1530 Sections totaling 136 centerline miles has been created; the City is seeking a consultant to perform pavement condition assessments, data entry, and create a five-year plan.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Alley Assessment - Preliminary Design Services | RFP-16-022 | 9/29/2016 10:00:00 AM |
Brighton Wastewater Phosphorous Removal Evaluation | RFP-16-021 | 8/29/2016 2:00:00 PM |
NORTH AND SOUTH TANK DRAINAGE ENGINEERING DESIGN | RFP-15-049 | 10/14/2015 1:00:00 PM |
On-Call Design Review Services | RFP-15-004 | 6/25/2015 4:00:00 PM |
City of Brighton Stormwater Master Plan | SOQ-15-025 | 5/7/2015 10:00:00 AM |
City of Brighton Water Master Plan | SOQ-15-024 | 4/30/2015 10:00:00 AM |
City of Brighton Wastewater Master Plan | SOQ-15-023 | 4/16/2015 10:00:00 AM |
ADA Self-Evaluation and Transition Plan Consulting Services | RFP-15-006 | 2/26/2015 4:00:00 PM |
Geotechnical Consultant Services for Ken Mitchell Lakes Phase 1&2 | RFP-15-007 | 1/30/2015 4:00:00 PM |
Transportation Master Plan | RFP-15-003 | 1/22/2015 11:00:00 AM |