Non-Potable Connections Construction Project - City of Brighton ITB-16-001
City of Brighton » ITB-16-001
City of Brighton » ITB-16-001
The information below is a summary of solicitation number ITB-16-001 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
Non-Potable Connections Construction Project
Date Issued: 01/15/2016
Deadline: 02/17/2016 prior to 10:00 AM M.S.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: TBD
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Utilities Department
Special Notices:
All or None Award
Bid Bond Required
Contractors License Required
FOB Destination
Insurance Required
Labor and Materials Bond Required
Maintenance Bond Required
Payment Terms = Net 30
Performance Bond Required
Onsite Visit Mandatory on 02/04/2016 01:30 PM at Onsite visits will follow prebid conference
Prebid Conference Mandatory on 02/04/2016 01:30 PM at City Hall, 500 S. 4th Avenue, Brighton, CO 80601
ACCEPTING VENDOR QUESTIONS:
Due Date: 2/9/2016 4:00:00 PM M.S.T.
Primary Contact Name: Mrs. Pamela L. Roeding, CPM
Title: Procurement & Contracts Supervisor
Email: proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City of Brighton by and thorough its Procurement & Contracts Supervisor is accepting Bids from qualified firms to furnish all labor, equipment, supplies, and material as necessary to construct Non-Potable Connections. The City is seeking to engage a Contractor for construction of Non-Potable Connections. School District 27J currently irrigates a few of their fields utilizing potable water from the City of Brighton. These potable connections are being transferred to non-potable connections with this project. Scope of services for this project consists of installing 1- 1inch meter; 1- 1-1/2in meter; 1-3” meter and appurtenances, 1,200LF of 4” PVC piping, 2-24 zone controllers, and 2-12 zone controllers. Construction is to be complete by the beginning of the irrigation season.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Design/build svcs for KM Lakes Cell 1 Inflow & Outflow Spillways | RFP- 16-017 | 8/26/2016 10:00:00 AM |
South Platte Interceptor Interconnect Construction | ITB-16-007R | 7/18/2016 11:00:00 AM |
South Platte Interceptor Interconnect Construction | ITB-16-007 | 4/18/2016 10:00:00 AM |
Cell 1 Rip Rap Construction | ITB-16-008 | 4/11/2016 11:00:00 AM |
Design/Build Services for Ken Mitchell Lakes Cell 1 Diversion | RFP-15-052 | 12/7/2015 10:00:00 AM |
Ken Mitchell Cell 1 Piping Addition | ITB-15-013 | 4/9/2015 11:00:00 AM |
Waterline 24” Construction at Southern Street | ITB-14-056 | 11/25/2014 11:00:00 AM |
Exterior Sewer Line Replacement at Historic City Hall Building | RFP-14-001 | 2/6/2014 4:00:00 PM |
Monument Sign Construction and Landscaping for US Highway 85 | ITB-13-067 | 11/20/2013 11:00:00 AM |
On-Call Construction Services, Supplies & Materials Bid | ITB-13-075 | 11/14/2013 11:00:00 AM |