Handicap Ramp Replacement Program (2015 CDBG Project) - City of Brighton ITB-15-047
City of Brighton » ITB-15-047
City of Brighton » ITB-15-047
The information below is a summary of solicitation number ITB-15-047 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
Handicap Ramp Replacement Program (2015 CDBG Project)
Date Issued: 09/08/2015
Deadline: 10/14/2015 prior to 11:00 AM M.D.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: TBD
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Streets and Fleet
Special Notices:
All or None Award
Bid Bond Required
Insurance Required
Labor and Materials Bond Required
Maintenance Bond Required
No Brand Name Specified
Performance Bond Required
Prebid Conference Recommended on 09/23/2015 10:00 AM at 500 S. 4th Avenue, Brighton, CO 80601- Basement Community Rooms 1&2
ACCEPTING VENDOR QUESTIONS:
Due Date: 9/30/2015 4:00:00 PM M.D.T.
Primary Contact Name: Mrs. Pamela Roeding
Title: Procurement and Contracts Supervisor
Email: Proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City of Brighton by and thorough its Division of Procurement & Contracts is accepting Bids from qualified firms to furnish all labor, equipment, supplies, and material as necessary for the removal and replacement of noncompliant handicap ramps with ADA compliant handicap ramps. Ramps will be adjusted in the field to meet existing conditions and maintain ADA compliancy, as stated in federal and state requirements, and this Invitation to Bid.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Greensand Plan Access Platform Construction | ITB-16-013R | 8/1/2016 10:00:00 AM |
2016 Crack Seal, Chip Seal, Slurry Seal, Patching Project | ITB-16-016 | 7/19/2016 2:00:00 PM |
South Platte Interceptor Interconnect Construction | ITB-16-007R | 7/18/2016 11:00:00 AM |
Pavilion Alley Paving Construction | ITB-16-015 | 6/27/2016 11:00:00 AM |
GREENSAND SCAFFOLDING CONSTRUCTION PROJECT | IFB-16-013 | 5/25/2016 2:00:00 PM |
Remodel & Upgrade of Front Desk at Recreation Center | ITB-16-004 | 5/10/2016 11:30:00 AM |
2016 CIP Patch/Overlay Project | ITB-16-009 | 5/4/2016 10:00:00 AM |
Cell 1 Rip Rap Construction | ITB-16-008 | 4/11/2016 11:00:00 AM |
Bromley-Hishinuma Farm Landscaping Phase 1 | ITB-16-003 | 2/12/2016 2:00:00 PM |
Outdoor Warning Systems | ITB-15-050-R | 12/15/2015 10:00:00 AM |