Erger's Pond Augmentation Station - City of Brighton RFP-15-026
City of Brighton » RFP-15-026
City of Brighton » RFP-15-026
The information below is a summary of solicitation number RFP-15-026 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
Erger's Pond Augmentation Station
Date Issued: 04/16/2015
Deadline: 05/14/2015 prior to 2:00 PM M.D.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: November 30, 2015
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Utilities Department
Special Notices:
All or None Award
FOB Destination
Insurance Required
No Brand Name Specified
Payment Terms = Net 30
Onsite Visit Recommended on 04/28/2015 11:30 AM at Erger's Pond in Brighton
Prebid Conference Recommended on 04/28/2015 11:00 AM at City Hall, 500 S. 4th Avenue, Brighton, CO 80601
ACCEPTING VENDOR QUESTIONS:
Due Date: 5/5/2015 4:00:00 PM M.D.T.
Primary Contact Name: Mrs. Pamela L. Roeding, CPM
Title: Procurement & Contracts Supervisor
Email: proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City of Brighton, Colorado by and through its Division of Procurement & Contracts is soliciting written sealed proposals from qualified firms to perform design services for Erger’s Pond Augmentation Station for the City of Brighton, as stated in the Request for Proposal. The Utilities Department owns three reservoirs, located on the west side of Brighton, that are used to store augmentation water. Ken Mitchell Cell 1 is the only reservoir that has the permanent capability to augment out of and/or fill with free river water. The City would like to expand their augmentation operations and is requesting proposals from qualified engineering firms for the design of an Augmentation Station at our north most reservoir, Erger’s Pond.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Alley Assessment - Preliminary Design Services | RFP-16-022 | 9/29/2016 10:00:00 AM |
Brighton Wastewater Phosphorous Removal Evaluation | RFP-16-021 | 8/29/2016 2:00:00 PM |
Greensand Airgap Engineering Services | RFP-16014 | 6/7/2016 11:00:00 AM |
NORTH AND SOUTH TANK DRAINAGE ENGINEERING DESIGN | RFP-15-049 | 10/14/2015 1:00:00 PM |
South Platte Reservoir’s Embankment Protection Designs | RFP-15-045 | 9/9/2015 10:00:00 AM |
On-Call Design Review Services | RFP-15-004 | 6/25/2015 4:00:00 PM |
City of Brighton Water Master Plan | SOQ-15-024 | 4/30/2015 10:00:00 AM |
Geotechnical Consultant Services for Ken Mitchell Lakes Phase 1&2 | RFP-15-007 | 1/30/2015 4:00:00 PM |
On-Call Engineering Services for Development Review | RFP-15-001 | 11/5/2014 4:00:00 PM |
Request for Proposals Well 11 Re-drill Design Services | RFP-14-038 | 8/4/2014 4:00:00 PM |