Design/build svcs for KM Lakes Cell 1 Inflow & Outflow Spillways - City of Brighton RFP- 16-017
City of Brighton » RFP- 16-017
City of Brighton » RFP- 16-017
The information below is a summary of solicitation number RFP- 16-017 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
Design/build svcs for KM Lakes Cell 1 Inflow & Outflow Spillways
Date Issued: 07/25/2016
Deadline: 08/26/2016 prior to 10:00 AM M.D.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: 03/31/2017
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Utilities
Special Notices:
All or None Award
Bid Bond Required
Contractors License Required
Disadvantaged Business Enterprise (DBE)
FOB Destination
Insurance Required
Labor and Materials Bond Required
Maintenance Bond Required
Minority Business Participation
No Brand Name Specified
Payment Terms = Net 30
Performance Bond Required
Women-Owned Business Participation
Onsite Visit Mandatory on 08/08/2016 10:00 AM at Post pre-bid
Prebid Conference Mandatory on 08/08/2016 10:00 AM at City Hall - 500 S. 4th Ave., Brighton, CO 80601
ACCEPTING VENDOR QUESTIONS:
Due Date: 8/15/2016 4:00:00 PM M.D.T.
Primary Contact Name: Mrs. Pamela L Roeding C.P.M
Title: Procurement and Contracts Manager
Email: proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City is requesting formal proposals for a design-build team to design and construct two spillways based upon Urban Drainage standards. The design-build team shall provide all survey, environmental and geotechnical evaluation, civil design and construction necessary to complete a seamless, cost-effective, and timely project. The design-build team shall procure, or assist in procurement of, all applicable permits including, but not limited to, floodplain permits, environmental permits and assessments, 404 permits, and erosion and sediment control permits. Time is a critical component for this project. The City is requiring the project infrastructure be completed by March 31, 2017.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
South Platte Interceptor Interconnect Construction | ITB-16-007R | 7/18/2016 11:00:00 AM |
South Platte Interceptor Interconnect Construction | ITB-16-007 | 4/18/2016 10:00:00 AM |
Cell 1 Rip Rap Construction | ITB-16-008 | 4/11/2016 11:00:00 AM |
Non-Potable Connections Construction Project | ITB-16-001 | 2/17/2016 10:00:00 AM |
Design/Build Services for Ken Mitchell Lakes Cell 1 Diversion | RFP-15-052 | 12/7/2015 10:00:00 AM |
NORTH AND SOUTH TANK DRAINAGE ENGINEERING DESIGN | RFP-15-049 | 10/14/2015 1:00:00 PM |
64 FARMSTEADS – HISTORIC SURVEYS PHASE 2 | RFP-15-035- | 9/10/2015 12:00:00 PM |
Greensand Plant Scaffolding Engineering Design | RFP-15-044 | 9/10/2015 10:00:00 AM |
South Platte Reservoir’s Embankment Protection Designs | RFP-15-045 | 9/9/2015 10:00:00 AM |
64 FARMSTEADS – HISTORIC SURVEYS PHASE 2 | RFP-15-035 phase 2 | 8/11/2015 11:34:22 AM |