City of Brighton Stormwater Master Plan - City of Brighton SOQ-15-025
City of Brighton » SOQ-15-025
City of Brighton » SOQ-15-025
The information below is a summary of solicitation number SOQ-15-025 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
City of Brighton Stormwater Master Plan
Date Issued: 03/26/2015
Deadline: 05/07/2015 prior to 10:00 AM M.D.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: December 31, 2015
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Utilities Department
Special Notices:
All or None Award
FOB Destination
Insurance Required
Payment Terms = Net 30
ACCEPTING VENDOR QUESTIONS:
Due Date: 4/21/2015 4:00:00 PM M.D.T.
Primary Contact Name: Mrs. Pamela L. Roeding, CPM
Title: Assistant Procurement & Contracts Manager
Email: proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City of Brighton, Colorado by and through its Division of Procurement and Contracts is soliciting written sealed Statements of Qualifications (SOQ) from qualified Engineering Consultant firms to perform design services for City of Brighton Stormwater Master Plan, as set forth in Exhibit A, Scope of Services attached to the Request for Qualifications (RFQ). To be eligible for consideration, the proposing firm must be capable of supplying the Design Services as noted herein, and must also meet all other criteria outlined in the RFQ.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Alley Assessment - Preliminary Design Services | RFP-16-022 | 9/29/2016 10:00:00 AM |
Brighton Wastewater Phosphorous Removal Evaluation | RFP-16-021 | 8/29/2016 2:00:00 PM |
NORTH AND SOUTH TANK DRAINAGE ENGINEERING DESIGN | RFP-15-049 | 10/14/2015 1:00:00 PM |
On-Call Design Review Services | RFP-15-004 | 6/25/2015 4:00:00 PM |
Pavement Condition Assessment | RFP-15-027 | 5/29/2015 10:00:00 AM |
City of Brighton Water Master Plan | SOQ-15-024 | 4/30/2015 10:00:00 AM |
City of Brighton Wastewater Master Plan | SOQ-15-023 | 4/16/2015 10:00:00 AM |
ADA Self-Evaluation and Transition Plan Consulting Services | RFP-15-006 | 2/26/2015 4:00:00 PM |
Geotechnical Consultant Services for Ken Mitchell Lakes Phase 1&2 | RFP-15-007 | 1/30/2015 4:00:00 PM |
Transportation Master Plan | RFP-15-003 | 1/22/2015 11:00:00 AM |