Cell 1 Rip Rap Construction - City of Brighton ITB-16-008

City of Brighton » ITB-16-008

The information below is a summary of solicitation number ITB-16-008 posted by City of Brighton.  As a reminder, this solicitation is closed and responses are no longer being accepted.

Cell 1 Rip Rap Construction

Date Issued: 03/14/2016

Deadline: 04/11/2016  prior to 11:00 AM   M.D.T.

Requisition Number:

Delivery Point: Brighton, CO

Delivery Date: July 15, 2016

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: City of Brighton

Using Department: Utilities Department

Special Notices: All or None Award
Bid Bond Required
Contractors License Required
FOB Destination
Insurance Required
Labor and Materials Bond Required
Maintenance Bond Required
No Brand Name Specified
Payment Terms = Net 30
Performance Bond Required
Prebid Conference Mandatory on 03/25/2016 01:30 PM at City Hall, 500 South 4th Avenue, Brighton, Colorado

ACCEPTING VENDOR QUESTIONS:

Due Date: 3/29/2016 5:00:00 PM M.D.T.

Primary Contact Name: Mrs. Pamela L. Roeding, CPM

Title: Procurement & Contracts Supervisor

Email: proeding@brightonco.gov

SUMMARY OF SPECIFICATIONS:

The City of Brighton by and thorough its Division of Procurement and Contracts is accepting Bids from qualified firms to furnish all labor, equipment, supplies, and material as necessary for the Cell 1 Rip Rap Construction.  The City of Brighton owns and operates a water storage reservoir on the west side of town that enables the City to augment their wells during the winter. This reservoir is known as Ken Mitchell Lakes Cell #1 (Cell 1). Cell 1, in a normal year, usually fluctuates in water levels depending on the amount of operation. When full, strong winds create major wave action that is potentially damaging to the reservoir. During the past few years several construction projects have taken place and created even more water surface area, thus raising the probability of greater damage from wave action. Cell 1 is lined by a slurry wall that runs along the perimeter of the lake. At some locations, the slurry wall is as close as 10 feet from the top of the bank due to past years of operation with no embankment protection.  

SIMILAR BIDS FROM CITY OF BRIGHTON

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
Design/build svcs for KM Lakes Cell 1 Inflow & Outflow Spillways RFP- 16-017  8/26/2016 10:00:00 AM 
South Platte Interceptor Interconnect Construction ITB-16-007R  7/18/2016 11:00:00 AM 
Pavilion Alley Paving Construction ITB-16-015  6/27/2016 11:00:00 AM 
South Platte Interceptor Interconnect Construction ITB-16-007  4/18/2016 10:00:00 AM 
Non-Potable Connections Construction Project ITB-16-001  2/17/2016 10:00:00 AM 
Bromley-Hishinuma Farm Landscaping Phase 1 ITB-16-003  2/12/2016 2:00:00 PM 
Outdoor Warning Systems ITB-15-050-R  12/15/2015 10:00:00 AM 
Design/Build Services for Ken Mitchell Lakes Cell 1 Diversion RFP-15-052  12/7/2015 10:00:00 AM 
Outdoor Warning Systems ITB-15-050  11/2/2015 10:00:00 AM 
Handicap Ramp Replacement Program (2015 CDBG Project) ITB-15-047  10/14/2015 11:00:00 AM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location