2016 CIP Patch/Overlay Project - City of Brighton ITB-16-009
City of Brighton » ITB-16-009
City of Brighton » ITB-16-009
The information below is a summary of solicitation number ITB-16-009 posted by City of Brighton. As a reminder, this solicitation is closed and responses are no longer being accepted.
2016 CIP Patch/Overlay Project
Date Issued: 03/31/2016
Deadline: 05/04/2016 prior to 10:00 AM M.D.T.
Requisition Number:
Delivery Point: Brighton, CO
Delivery Date: 90 Days
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Brighton
Using Department: Street/Fleet Department
Special Notices:
All or None Award
Bid Bond Required
Contractors License Required
FOB Destination
Insurance Required
Labor and Materials Bond Required
Maintenance Bond Required
No Brand Name Specified
Payment Terms = Net 30
Performance Bond Required
Prebid Conference Recommended on 04/14/2016 10:00 AM at City Hall, 500 South 4th Avenue, Brighton, CO 80601
ACCEPTING VENDOR QUESTIONS:
Due Date: 4/20/2016 4:00:00 PM M.D.T.
Primary Contact Name: Mrs. Pamela L. Roeding, CPM
Title: Procurement & Contracts Supervisor
Email: proeding@brightonco.gov
SUMMARY OF SPECIFICATIONS:
The City of Brighton by and thorough its Procurement & Contracts Division is accepting Bids from qualified firms to furnish all labor, equipment, supplies, and material as necessary for the 2016 CIP Patch/Overlay Project. This project consists of asphalt patching, rotomilling, asphalt overlay, and pavement striping within the City. Detection loops will be replaced for east bound traffic only at US85 and Bromley Lane.
SIMILAR BIDS FROM CITY OF BRIGHTON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
2016 Crack Seal, Chip Seal, Slurry Seal, Patching Project | ITB-16-016 | 7/19/2016 2:00:00 PM |
Pavilion Alley Paving Construction | ITB-16-015 | 6/27/2016 11:00:00 AM |
Handicap Ramp Replacement Program (2015 CDBG Project) | ITB-15-047 | 10/14/2015 11:00:00 AM |
TRAFFIC SIGNAL SYSTEMS IMPROVEMENT PROGRAM CONSTRUCTION PHASE | ITB-15-048 | 10/8/2015 10:00:00 AM |
2015 CIP Overlay/Concrete Replacement Project | ITB-15-040R | 9/9/2015 2:00:00 PM |
2015 CIP Overlay/Concrete Replacement Project | ITB-15-040 | 8/4/2015 2:00:00 PM |
2015 Crack Seal-Chip Seal-Slurry Seal-Concrete Replacement Project | ITB-15-010 | 4/14/2015 2:00:00 PM |
Tower Road and Southern Street Road Construction | ITB-14-034 | 9/9/2014 11:00:00 AM |
Handicap Ramp Replacement Program (2013 CDBG Project) | ITB-13-078 | 1/22/2014 11:00:00 AM |
Monument Sign Construction and Landscaping for US Highway 85 | ITB-13-067 | 11/20/2013 11:00:00 AM |