AIP-46 Runway 10/28 Reconstruction - Arapahoe County Public Airport Authority ITB-AIP-46

Arapahoe County Public Airport Authority » ITB-AIP-46

The information below is a summary of solicitation number ITB-AIP-46 posted by Arapahoe County Public Airport Authority.  As a reminder, this solicitation is closed and responses are no longer being accepted.

AIP-46 Runway 10/28 Reconstruction

Date Issued: 04/01/2013

Deadline: 04/30/2013  prior to 10:00 AM   M.D.T.

Requisition Number:

Delivery Point: 7800 S. Peoria Street, Englewood, CO 80112

Delivery Date: Spring-Fall 2013

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Arapahoe County Public Airport Authority

Using Department: Planning & Development

Special Notices: All or None Award
Bid Bond Required
Bidder Prequalification/Preregistration Required
Contractors License Required
Insurance Required
Minority Business Participation
Payment Bond Required
Performance Bond Required
Prevailing Wage Required
Some Items are Brand Name or Equal
Job-Walk Visit Recommended on 04/16/2013 11:00 AM at 7800 S. Peoria Street Englewood, CO 80112
Prebid Conference Recommended on 04/16/2013 11:00 AM at 7800 S. Peoria Street Englewood, CO 80112

ACCEPTING VENDOR QUESTIONS:

Due Date: 4/22/2013 2:00:00 PM M.D.T.

Primary Contact Name: Mr. Jeff Campbell

Title: Project Manager

Email: jeff.campbell@ch2m.com

SUMMARY OF SPECIFICATIONS:

1 TABLE OF CONTENTS 2 BIDDING REQUIREMENTS 3 Invitation for Bids ................................................................ ................................................ I-1 – I-1 4 Instructions to Bidders ................................................................ .................................... II-1 – II-10 5 Proposal.............. ................................................................ ............................................ III-1 – III-4 6 Bid Documents.. ................................................................ ............................................ IV-1 – IV-6 7 8 CONTRACT FORMS 9 Notice of Award ................................................................ ................................................ V-1 – V-1 10 Contract Agreement ................................................................ ....................................... VI-1 – VI-4 11 Performance Bond ................................................................ ...................................... VII-1 – VII-2 12 Payment Bond... ................................................................ ........................................ VIII-1 – VIII-2 13 Notice to Proceed ................................................................ ........................................... IX-1 – IX-1 14 Notice of Contractor’s Settlement ................................................................ .................... X-1 – X-1 15 Wage Rates....... ................................................................ ........................................... XI-1 – XI-15 16 CONDITIONS OF THE CONTRACT 17 FAA Special Provisions ................................................................ ............................ XII-1 – XII-15 18 Airport Special Provisions ................................................................ ........................ XIII-1 – XIII-8 19 20 GENERAL PROVISIONS 21 Section 10 Definition of Terms ................................................................ .................................... 1-4 22 Section 20 Proposal Requirements and Conditions ................................................................ ..... 1-3 23 Section 30 Award and Execution of Contract ................................................................ .............. 1-2 24 Section 40 Scope of Work ................................................................ ........................................... 1-3 25 Section 50 Control of Work ................................................................ ......................................... 1-6 26 Section 60 Control of Materials ................................................................ ................................... 1-4 27 Section 70 Legal Regulations and Responsibility to Public ......................................................... 1-6 28 Section 80 Prosecution and Progress ................................................................ ........................... 1-6 29 Section 90 Measurement and Payment ................................................................ ........................ 1-6 30 Section 100 Contractor Quality Control Program ................................................................ ........ 1-6 31 Section 110 Method of Estimating Percentage of Material within Specification Limits (PWL) . 1-6 32 Section 120 Nuclear Gauges ................................................................ ........................................ 1-1 33 34 TECHNICAL SPECIFICATIONS 35 Item P-100 Mobilization and Traffic Control ................................................................ .............. 1-2 36 Item P-101 Surface Preparation ................................................................ ................................... 1-3 37 Item P-149 Watering ................................................................ .................................................... 1-2 38 Item P-150 Demolition ................................................................ ................................................ 1-2 39 Item P-152 Excavation and Embankment ................................................................ .................... 1-8 BID SUBMITTAL 463634 TOC-2 TABLE OF CONTENTS 40 Item P-153 Controlled Low-Strength Material (CLSM) .............................................................. 1-4 41 Item P-156 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control ................. 1-3 42 Item P-158 Flyash Treated Subgrade ................................................................ ........................... 1-7 43 Item P-161 Geotextile ................................................................ .................................................. 1-4 44 Item P-209 Crushed Aggregate Base Course ................................................................ .............. 1-7 45 Item P-310 Stress Absorbing Fabric ................................................................ ........................... 1-2 46 Item P-401 Plant Mix Bituminous Pavements ................................................................ .......... 1-24 47 Item P-603 Bituminous Tack Coat ................................................................ ............................. 1-3 48 Item P-610 Structural Portlant Cement Concrete ................................................................ ....... 1-8 49 Item P-620 Pavement Marking ................................................................ ................................... 1-6 50 Item P-621 Saw-Cut Grooves ................................................................ ..................................... 1-3 51 Item P-645 Asphalt Seal Coat ................................................................ ..................................... 1-3 52 Item D-701Pipe for Storm Drains and Culverts ................................................................ .......... 1-3 53 Item D-705 Pipe Underdrains for Airports ................................................................ ................. 1-5 54 Item D-710 Rock Riprap ................................................................ .............................................. 1-2 55 Item D-751 Manholes and Valves ................................................................ .............................. 1-5 56 Item F-160 Wire Fence with Wood Posts ................................................................ .................... 1-4 57 Item F-162 Chain-Link Fence ................................................................ ..................................... 1-3 58 Item T-901 Seeding ................................................................ ..................................................... 1-5 59 Item L-100 General Provisions – Airfield Lighting System ......................................................... 1-7 60 Item L-108 Underground Power Cable for Airports ................................................................ ... 1-9 61 Item L-110 Airport Underground Electrical Duct Banks and Conduits ...................................... 1-8 62 Item L-115 Electrical Manholes and Junction Structures ............................................................ 1-8 63 Item L-125 Installation of Airport Lighting Systems ................................................................ 1-12 64 Attachment A – Construction Safety and Phasing Plan (CSPP) 65 Attachment B – Geotechnical Engineering Study 

SIMILAR BIDS FROM ARAPAHOE COUNTY PUBLIC AIRPORT AUTHORITY

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
Invitation to Bid AIP-50 ITB-AIP-50  3/31/2016 10:00:00 AM 
TAXIWAY C EXTENSION AIP NO. 3-08-0029-49 ITB-AIP-49  5/13/2015 10:00:00 AM 
INVITATION FOR BIDS AIP-47 ITB-AIP-47rb  2/17/2015 10:00:00 AM 
INVITATION FOR BIDS ITB-AIP-47  4/29/2014 10:00:00 AM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location