East Plum Creek Stream and South Well Field Improvements - Town of Castle Rock IFB-SK-2016-10

Town of Castle Rock » IFB-SK-2016-10

The information below is a summary of solicitation number IFB-SK-2016-10 posted by Town of Castle Rock.  As a reminder, this solicitation is closed and responses are no longer being accepted.

East Plum Creek Stream and South Well Field Improvements

Date Issued: 08/02/2016

Deadline: 08/22/2016  prior to 2:30 PM   M.D.T.

Requisition Number:

Delivery Point: 175 Kellogg Court, Castle Rock, CO 80109

Delivery Date: to be determined

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Town of Castle Rock

Using Department: Utilities Department

Special Notices: All or None Award
Bid Bond Required
Insurance Required
Labor and Materials Bond Required
MINIMUM EXPERIENCE REQUIRED
No Brand Name Specified
Payment Bond Required
Performance Bond/Guarantee Required
Prebid Conference Mandatory on 08/09/2016 02:30 PM at Town of Castle Rock Utilities Department, 175 Kellogg Ct, Castle Rock, CO 80109

ACCEPTING VENDOR QUESTIONS:

Due Date: 8/15/2016 5:00:00 PM M.D.T.

Primary Contact Name: Ms. Barbara Horton

Title: P.E. Stormwater Project Manager

Email: bhorton@CRgov.com

SUMMARY OF SPECIFICATIONS:

The work to be performed under this contract generally includes: Sculpted Concrete Drop Structures 2 EA, Steel Sheet Piling (Type II) 6,610 SF, Soil Filled Riprap (Type M) 1,490 CY, Bank Stabilization 1,300 CY, Grading, Dewatering and Water Control, Plantings and GESC Items. This project is subject to the requirements of Section 404 of the Clean Water Act under the jurisdiction of the U.S. Department of the Army. Additionally, this project is located within a FEMA regulated floodplain and Preble’s Meadow Jumping Mouse habitat and is subject to all local, state and federal regulations. The Contractor is responsible for obtaining State Stormwater Discharge and Dewatering permits, as applicable. The Contractor shall also obtain Construction and GESC permits with the Town. There are no fees associated with these Town permits. The location of the work to be completed under this contract is shown on the plans cover sheet (at the end of South Perry Street, southeast of Brookside Circle). 

SIMILAR BIDS FROM TOWN OF CASTLE ROCK

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
Town of Castle Rock 2016 CIPP Project IFB-NP-2016-13  9/14/2016 11:00:00 AM 
Construction of Festival Park IFB-NP-2016-11  8/31/2016 2:00:00 PM 
2016 Town Reclamation Project RFQ-SK-2016-4  6/16/2016 2:00:00 PM 
Plum Creek Parkway Intersection Improvements Project IFB-NP-2016-8  4/14/2016 3:00:00 PM 
Plum Creek Parkway Intersection Improvements Project IFB-NP-2016-5  3/24/2016 1:00:00 PM 
East Plum Creek Stabilization at Meadows Parkway IFB-SK-2016-4  3/11/2016 11:00:00 AM 
Downtown Alley Rehabilitation Project IFB-SK-2016-1  3/10/2016 1:00:00 PM 
Plum Creek Pkwy @ Sellers Gulch Structure ID# CAS PLMCKPW-1 RFP-SK-2015-26  1/8/2016 2:00:00 PM 
Philip S. Miller Park Phase 2 IFB-AA-2014-12  1/15/2015 2:00:00 PM 
2013 Post-Storm Ditch Maintenance Project RFQ-AA-2013-7  11/26/2013 4:00:00 PM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location