Playground Site Prep - Mapleton Public School RFP-JG-15-Welby Playground Surfacing

Mapleton Public School » RFP-JG-15-Welby Playground Surfacing

The information below is a summary of solicitation number RFP-JG-15-Welby Playground Surfacing posted by Mapleton Public School.  As a reminder, this solicitation is closed and responses are no longer being accepted.

Playground Site Prep

Date Issued: 06/25/2015

Deadline: 07/28/2015  prior to 2:00 PM   M.D.T.

Requisition Number:

Delivery Point: Denver, CO

Delivery Date: TBD

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Mapleton Public School

Using Department: Purchasing

Special Notices: All or None Award
Bid Bond Required
Bidder Prequalification/Preregistration Required
Contractors License Required
FOB Destination
Installation Required
Insurance Required
Labor and Materials Bond Required
Payment Bond Required
Performance Bond Required
Prevailing Wage Required
Prebid Conference Mandatory on 07/20/2015 09:30 AM at 1200 E. 78th Ave. Denver, CO 80229

ACCEPTING VENDOR QUESTIONS:

Due Date: 7/23/2015 2:00:00 PM M.D.T.

Primary Contact Name: Mrs. Janet Gibbons

Title: Purchsing

Email: gibbonsj@mapleton.us

SUMMARY OF SPECIFICATIONS:

SCOPE OF WORK Welby Community- Playground Surfacing / Site Preparation Furnish all labor, equipment, materials, supplies, tools, rentals, and transportation to perform all operations in connection with project to complete removal of identified equipment and site prep for new installation of new playground equipment. All Work completed on the project will be performed in compliance with the Davis-Bacon Act and Federal Labor Standards Provisions (See Attachment 1, Davis-Bacon Prevailing Wages; and Attachment 2, HUD-4010 Form; and Attachment 3, Davis-Bacon Bid Language). All workers employed on this project shall receive the minimum prevailing Davis-Bacon wage requirements or latest version. Wage requirements may change prior to start of work; current wage rates are in effect at the time of the bid opening. Wages will be effective 90 days after bid opening. If construction contract is not signed within the 90 day period, the most current wage rates will be in effect at that time. On all federally funded projects the apparent awarded vendor must be verified that they are no listed as debarred on the SAMS debarment list. Mapleton Public Schools will verify debarment prior to award. • Saw cut and remove approximately 4,000 sf of asphalt (in purple on diagram 1) • Prepare surface to minimum 12” fall depth, install concrete curb around the perimeter as a containment boarder for the wood fiber chips, as necessary, due to slight slope of site. • Install ramp if needed by main entrance gate. • Prepare surface for felt and drain tiles install (felt, drain tiles and fiber chips will be installed by playground installer) • Install 4’ fence with gate to new perimeter (marked in orange on diagram). Maintain fire lane gate opening as well. • Install 50’ of 8’ fence behind current basketball goals • Mask and repaint tetherball and basketball lines • Mask and repaint parking space lines as indicated in Diagram 2 *bidder to verify actual square footage needed for all line items. Reference- Diagram 1 and 2 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location