Freezer System and Warehouse - Mapleton Public School RFP-JG-#15-FREEZER

Mapleton Public School » RFP-JG-#15-FREEZER

The information below is a summary of solicitation number RFP-JG-#15-FREEZER posted by Mapleton Public School.  As a reminder, this solicitation is closed and responses are no longer being accepted.

Freezer System and Warehouse

Date Issued: 01/08/2015

Deadline: 01/30/2015  prior to 2:00 PM   M.S.T.

Requisition Number: RFP#15-FREEZER

Delivery Point: Thornton, CO

Delivery Date: ASAP

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Mapleton Public School

Using Department: Purchasing

Special Notices: All Brands are Acceptable
All or None Award
Contractors License Required
FOB Destination
Installation Required
Insurance Required
Warranty Information Required
Prebid Conference Mandatory on 01/16/2015 09:00 AM at Mapleton Public Schools - 591 E. 80th Ave. Denver, CO 80229

ACCEPTING VENDOR QUESTIONS:

Due Date: 1/23/2015 2:00:00 PM M.S.T.

Primary Contact Name: Mrs. Janet Gibbons

Title: Purchasing

Email: gibbonsj@mapleton.us

SUMMARY OF SPECIFICATIONS:

Through this Request for Proposal (RFP), the Mapleton Public School District Food Service Department is soliciting proposals to furnish and install a freezer and warehouse (steel structure) at Mapleton Public School District Food Service production Kitchen located at 8990 York Street Thornton, CO 80229. This project shall be considered a design build. The contractor shall furnish and install all labor, materials, and services required for a complete and proper installation. The contractor’s scope of work includes, but is not limited to: recommending the design of the freezer and warehouse (steel structure) to include all mechanical and electrical systems, installation of an insulated concrete pad with entrance ramp and perimeter curb, the erection of a freezer building, installation of the mechanical system associated with the freezer and controls system, installation of automatic doors, installation of manual doors, installation of lighting, alarms, overrides and other electrical components, components necessary for the proper and intended function of the Freezer and Warehouse Buildings. The Racking System to be used will be provided and installed by the District.  The contractor is responsible for the training of District personnel in the use and maintenance of the Freezer and Warehouse Buildings. 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location