CDOT KOA Campus, General Contractor Prequalification - CDOT IFB-20353 MM

CDOT » IFB-20353 MM

The information below is a summary of solicitation number IFB-20353 MM posted by Colorado Department of Transportation.  As a reminder, this solicitation is closed and responses are no longer being accepted.

CDOT KOA Campus, General Contractor Prequalification

Date Issued: 12/02/2015

Deadline: 12/30/2015  prior to 12:00 PM   M.S.T.

Requisition Number: 700031315

Delivery Point: Denver, CO

Delivery Date: 1/30/16

Type of Purchase: Term: Unspecified

Construction Related: No

Type of Response Allowed: Hard Copy Only

Issuing Agency: Colorado Department of Transportation

Using Department: Property Management

Special Notices: All or None Award
Bid Bond Required
Bidder Prequalification/Preregistration Required
FOB Destination
Insurance Required
Labor and Materials Bond Required
Performance Bond Required
Prebid Conference Mandatory on 12/10/2015 10:00 AM at CDOT, 18500 E. Colfax Avenue, Aurora, CO 80011

ACCEPTING VENDOR QUESTIONS:

Due Date: 12/17/2015 12:00:00 PM M.S.T.

Primary Contact Name: Ms. Anne Feeser

Title: State Buildings Delegate

Email: anne.feeser@state.co.us

SUMMARY OF SPECIFICATIONS:

CDOT is employing a two-step Advertisement for Bid process in order to pre-qualify general contractors. The specific requirements for the pre-qualification submittals are attached along with the evaluation criteria which will be applied to the submittals. After the pre-qualification is completed, pre-qualified contractors will be invited to bid the project conventionally, with the intent of awarding to the lowest responsible bidder based on the apparent low bid of the project. There are two phases to this project, which may be bid at separate times. Phase 1 of the project includes the construction of 3 buildings, renovation and addition to one building and construction of a secondary containment structure on the existing Aurora KOA Campus. Associated site work will include grading/earthwork for the structure, upgrades to the existing athletic field, drainage, utilities, and landscaping, while maintaining access and services to the existing buildings.  Construction is estimated to begin in April 2016 and to be completed within 9-12 months.  Phase 2 of the project includes the construction of 4 buildings, including a Best Management Practice site, and renovation of one building and on the existing Aurora KOA Campus. Associated site work will include grading/earthwork for the structure, upgrades to the existing athletic field, drainage, utilities, and landscaping, while maintaining access and services to the existing buildings. Construction is estimated to begin in Summer 2016 and to be completed within 9-12 months.  

SIMILAR BIDS FROM CDOT

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
CDOT FY 16 Metal Building Sand Sheds IFB-20746  6/22/2016 2:00:00 PM 
CDOT Twin Lakes 10 Foot Addition IFB-20352  5/19/2016 2:00:00 PM 
Rifle Office, Restroom Remodel Project # 21295 IFB-21295-AFO  1/20/2016 2:00:00 PM 
Sugar City 6 bay Vehicle Storage Facility IFB-19349  10/21/2015 2:00:00 PM 
Design build RFP for CDOT HQ/R1 Office Building - 20495-1  7/24/2015 9:00:00 AM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location