2016 BROADWAY AND COUNTY LINE ROAD TRAFFIC SIGNAL AND DUAL LEFT SB - City of Littleton IFB-0010-2016
City of Littleton » IFB-0010-2016
City of Littleton » IFB-0010-2016
The information below is a summary of solicitation number IFB-0010-2016 posted by City of Littleton. As a reminder, this solicitation is closed and responses are no longer being accepted.
2016 BROADWAY AND COUNTY LINE ROAD TRAFFIC SIGNAL AND DUAL LEFT SB
Date Issued: 07/27/2016
Deadline: 08/18/2016 prior to 11:00 AM M.D.T.
Requisition Number:
Delivery Point: Littleton, CO
Delivery Date: 194 Calendar Days
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Littleton
Using Department: Transportation Engineering
Special Notices:
All or None Award
Bid Bond Required
Bid Deposit Required
Bidder Prequalification/Preregistration Required
Brand Name Only
F.O.B Pre-paid
Insurance Required
Labor and Materials Bond Required
Performance Bond Required
Prevailing Wage Required
Prebid Conference Recommended on 08/11/2016 10:00 AM at Community Room, City of Littleton, 2255 West Berry Avenue, Littleton, CO 80120
ACCEPTING VENDOR QUESTIONS:
Due Date: 8/10/2016 4:00:00 PM M.D.T.
Primary Contact Name: Mr. Tim Weaver
Title: Traffic Analyst
Email: tweaver@littletongov.org
SUMMARY OF SPECIFICATIONS:
2016 BROADWAY AND COUNTY LINE ROAD TRAFFIC SIGNAL AND DUAL LEFT SB TURN LANE 19143 This project will rebuild the traffic signal at this intersection. The current traffic signal consists of poles and span wire the new signal will be poles and mast arms. The project will also change the lane configuration from a single southbound left turn lane to a double left turn lane. To do this we will remove the attached sidewalk adjacent to Broadway on the west and move the curb line. Also we will build a new detached sidewalk along the top of the existing berm to the west. In addition there will be removal of some of the median in Broadway back toward the north. The project is subject to Littleton City Council appropriation.
SIMILAR BIDS FROM CITY OF LITTLETON
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
2016 Street Rehabilitation Crack Repair | IFB-0013-2016 | 9/8/2016 11:00:00 AM |
2016 Street Rehabilitation Crack Fill | IFB-0014-2016 | 9/8/2016 11:00:00 AM |
2016 Concrete Pavement Repairs S. Broadway and E. Arapahoe Road | IFB-0015-2016 | 9/8/2016 11:00:00 AM |
2016 STREET REHABILITATION W CHURCH ST | IFB-0009-2016 | 4/21/2016 2:00:00 PM |
2016 STREET REHABILITATION S WINDERMERE ST | IFB-0008-2016 | 4/14/2016 11:00:00 AM |
2015 Street Maintenance Trailmark | IFB-0025-2015 | 12/10/2015 2:00:00 PM |
2015_STREET_REHABILITATION_S_CROCKER_WY | IFB-0019-2015 | 10/1/2015 2:00:00 PM |
2015 CONCRETE REHABILITATION W BOWLES AVE | IFB-0018-2015 | 9/24/2015 2:00:00 PM |
2015 STREET REHABILITATION S BROADWAY PROJECT | IFB-0008-2015 | 4/9/2015 2:00:00 PM |
2014 Concrete Rehabilitation W Bowles Ave at S Sheridan Blvd Proj | IFB-0020-2014 | 10/16/2014 2:00:00 PM |