Lincoln Corridor Project - Final Design - City of Fort Collins 8139

City of Fort Collins » 8139

The information below is a summary of solicitation number 8139 posted by City of Fort Collins.  As a reminder, this solicitation is closed and responses are no longer being accepted.

Lincoln Corridor Project - Final Design

Date Issued: 06/23/2015

Deadline: 07/14/2015  prior to 3:00 PM   M.D.T.

Requisition Number:

Delivery Point: Fort Collins, CO

Delivery Date: See Bid Documents

Type of Purchase: Term: Unspecified

Construction Related: No

Type of Response Allowed: Online or Hard Copy

Issuing Agency: City of Fort Collins

Using Department: Engineering

Special Notices: Prebid Conference Recommended on 06/30/2015 02:00 PM at Training Room (Conference Room 2E), 215 N Mason Street, Fort Collins

ACCEPTING VENDOR QUESTIONS:

Due Date: 7/6/2015 5:00:00 PM M.D.T.

Primary Contact Name: Ms. Erika Keeton

Title: Project Manager

Email: Ekeeton@fcgov.com

SUMMARY OF SPECIFICATIONS:

The City of Fort Collins is requesting proposals from a consulting firm or team to provide the City with engineering design services for the Lincoln Corridor Project. The successful firm/team will identify and address all of the tasks, issues, and deliverables in their proposal and as described through this RFP. The successful candidate must possess the expertise and requisite skills necessary to complete the project within the established schedule and budget, and be motivated to work with city staff, citizens, and governing bodies to accomplish the goals and objectives of this project. Tasks to complete the project include, but are not limited to, those outlined in the enclosed Scope of Work. Proposers should note that project understanding, firm capability and ability to meet the project schedule are important elements in selecting the successful firm/team to be awarded a contract through this Request for Proposal (RFP) process. 

SIMILAR BIDS FROM CITY OF FORT COLLINS

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
8355 Carbon Sequestration Report Consulting 8355  8/26/2016 3:00:00 PM 
Bridge Inspection, Maintenance, Repair and Replacement Program 8331  6/23/2016 3:00:00 PM 
Drake Bridge Replacement Design Services 8293  5/11/2016 3:00:00 PM 
Low Impact Development Implementation Manual 8274  4/22/2016 3:00:00 PM 
8251 North Front Range Regional Wasteshed Planning Study 8251  2/26/2016 3:00:00 PM 
8220 State of the River Report 8220  2/9/2016 3:00:00 PM 
Arthur Ditch Master Planning & Aternatives Analysis 8226  2/3/2016 3:00:00 PM 
8208 Regional Wasteshed Planning Study 8208  12/28/2015 3:00:00 PM 
8185 Transportation Air Quality Manual 8185  11/13/2015 3:00:00 PM 
General Contractor for Southeast Community Park 8181  11/5/2015 3:00:00 PM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location