Chapman Drive Flood Damage Repair and Mitigation

Date Issued: 02/25/2016

Deadline: 03/21/2016  prior to 2:00 PM   M.D.T.

Requisition Number:

Delivery Point: see RFP

Delivery Date: see RFP

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: City of Boulder

Using Department: Open Space Mountain Parks

Special Notices: Bid Bond Required
Insurance Required
Labor and Materials Bond Required
Performance Bond Required
Job-Walk Visit Recommended on 03/14/2016 09:00 AM at Realization Point on Flagstaff Mountain

SUMMARY OF SPECIFICATIONS:

This project consists of repairing a flood damaged 10’ wide access road and trail (Chapman Drive)  on property owned by City of Boulder Open Space and Mountain Parks. This road experienced damage varying in  character, from minor surface erosion to complete washout. The objective of this project is to repair the road to pre-disaster function and capacity while also making modifications to the grading to reduce vulnerability to damage by future flood events. Work will include reconditioning of existing grades, repairing erosion damage to existing subgrade, transport, processing and  placement of existing stockpiled material along Flagstaff Road, west of the project, grading of ditches, installation of culverts, construction of stone masonry drainage structures, construction of drainage features, placement of new surfacing material, and site restoration. The project also includes improvements to the parking and access drive at the “Top Shop” near the upper end of the  project, off Flagstaff Road. 

SIMILAR BIDS FROM CITY OF BOULDER

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
NCAR-Bear Canyon & Mesa Roads Flood Damage Repair RFB-73-2016  9/9/2016 2:00:00 PM 
Broadway Parking Structure Repairs RFB-63-2016  8/26/2016 2:00:00 PM 
Miscellaneous Flood and Greenways Construction Projects RFB-58-2016  6/15/2016 2:00:00 PM 
Flat Iron Golf Course Event Center Demolition RFB-08-2016  2/23/2016 11:00:00 AM 
South Boulder Creek @ Ararpahoe - Sediment Removal RFB-03-2016  2/9/2016 2:00:00 PM 
Civic Area Sitework Construction Contracting Prequalification RFQ-05-2016  2/8/2016 4:00:00 PM 
75th St Wastewater Treatment Facility Nitrogen Upgrades Project RFB-27-2015  5/8/2015 2:00:00 PM 
Two Mile Canyon Creek Detention Pond Flood Repair RFB-20-2015  4/29/2015 2:00:00 PM 
2015 Street Resurfacing/Reconstruction Project RFB-02-2015  4/23/2015 2:00:00 PM 
Kossler Dam Rehabilitation RFB-51-2014  12/5/2014 2:00:00 PM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location